Year built: 1891. (1906 addition)
Cost: $12,000.
First floor: dining room for 80, kitchen, pantry, storeroom, quarters for members
Second floor: quarters for 15 members.
Third floor: dormitory style room.
The history of the pier. (a.k.a Million Dollar Pier) The building pictured in the postcard opened in 1926 and was demolished in 1967. An inverted pyramid-shaped building was constructed in its place in 1973. Empty pier looms over St. Pete. (St. Petersburg Tribune, 9/22/2013)
From Bay Area Medical Center history. Marinette General Hospital opened its doors on Sept. 3, 1940. Located at the current BAMC site, Marinette General had an 80-bed capacity and cost $315,000.